Client: Muhibbah Engineering Bhd
Location: Offshore Malaysia
Year executed: 2020
The East Cendor (and Kemasik) fault block is part of the Jambu-Liang structure that lies within an active petroleum system.
Oil in East Cendor was discovered by East Cendor-1 and East Cendor-1ST drilled between January and March 2013 and most recently by East Cendor-2 and East Cendor-2ST in October 2014.
Muhibbah Engineering (M) Bhd, together with SPT Offshore and Asian Lift Pte. Ltd. completed the installation of the Petrofac ECW-A Jacket and boat-landing at the East Cendor field offshore Malaysia. The tri-legged jacket is founded on a suction pile foundation and has a total weight of 1100 mT. Despite the challenging conditions of COVID-19 affecting worldwide vendors and suppliers, the installation of the jacket was delayed by only 2 months and all parties successfully managed to complete the planned work safely.