Client: Subsea 7
Location: Offshore Mediteranian
Year executed: 1999
For Chevron, the North Nemba jacket was installed within 24 hours, including wet upending, set down and suction pile installation. The verticality of the structure was within 0.25 deg due to SPT Offshore’s suction pump spread, which is capable of selective and proportional suction on the individual suction piles.