SPT was awarded the detailed design of the suction anchors for the mooring of a 340m long FPSO for a project offshore Brazil.
The FPSO will be semi-taut moored in 2,100m water depth with 20 suction anchors. The mooring design loads are exceeding the 1,500 metric tons.