Succesful loadout

Succesful loadout

In Rotterdam 7 of our suction piles for a new project with a total weight of 900 Mt were succesfully load-out. The suction piles are equipped around with our innovative scour protection system. The umbrella-like system uses SSCS frond mats, is pre-installed onshore, and is self-deploying during installation of the suction piles.
Loadout IOG_2
Loadout IOG_3
Loadout IOG_1