Summit SRT

Review installation documents and suction installation services for 8 Mooring piles,
one PLEM and one Landingpad.

SPT achievements

All suction piles installed to target penetration within 3.5 hrs with the SAPS-007 suction spread.

Facts and figures

  • Client
    Geocean
  • Year completed
    2018
  • Location
    Offshore Bangladesh
  • Mooring piles
    OD 9m x 9.5/11m
  • PLEM
    OD 7.5m x 8m
  • PAD
    OD 6.35m x 5m
  • Soil conditions
    Overconsolidated clay soils with an o verlaying sand layer
  • Water depth
    33m
  • Project categories
    Moorings
+