HomeTrack RecordStatoil Dudgeon Substation

Statoil Dudgeon Substation

Design, fabrication and installation of the suction pile foundation for Statoil Siemens Dudgeon Transformer Substation to support Sembmarine SLP being the main fabricator for this substation. The 4-leg jacket will support the topsides weighing approx. 1,850 ton. It's this first suction pile founded substation in UK waters. 

Scope of work

• Detailed design suction pile foundation

• Fabrication of suction pile foundation

• Installation of suction pile foundation

Facts and figures

  • Client
    SLP Sembmarine
  • Year completed
    2016
  • Location
    UK North Sea
  • Suction Piles
    4x suction piles of 9m OD x 6m deep
  • Topside weights
    2,000t
  • Jacket and Suction Piles Weight
    Jacket weight 900t
  • Water depth
    Dense sand to stiff clay
  • Project categories
    Suction Piles for Wind Turbine
+