HomeTrack RecordPetroCanada de Ruyter Development

PetroCanada de Ruyter Development

Scope of Work

  • Installation of GBS suction skirt foundation
  • Installation of cluster suction pile foundation for TMLS oil offloading structure

Facts and figures

  • Client
    Smit
  • Year Completed
    2006
  • Location
    Dutch North Sea
  • Suction Piles
    4x 7.5m OD x 5.8m length
  • Structure Weight
    240t
  • Soil Condition
    Silty Sands
  • Water Depth
    25m
  • Project categories
    Subsea Structures
+