HomeTrack RecordNoble Hadera Oil Offloading Buoy

Noble Hadera Oil Offloading Buoy

Scope of Work

  • Installation engineering for suction piles
  • Installation of suction piles

Facts and figures

  • Client
    Micoperi
  • Year Completed
    2012
  • Location
    Mediterranean
  • Suction Piles
    8x 9m OD X 11.5 - 18.5m length
  • Soil Condition
    Soft to medium stiff clays
  • Water depth
    80m
  • Project categories
    Moorings
+