With SPT Offshore's proprietary SIP-1 design, a critical EPCI schedule of 9 months was met. The SIP-1 substructure was docked over an existing well, making pre-drilling also a feasible option for a SIP-1.

Scope of Work

  • Detailed design suction pile foundation
  • Fabrication of suction piles
  • Installation of SIP1 tripod suction pile foundation

Facts and figures

  • Client
    HSM Offshore
  • Year Completed
    2008-2009
  • Location
    UK North Sea, Beatrice area
  • Suction Piles
    3x 10m OD x 7.5m deep
  • Topsides Weight
    800t
  • Substructures and Suction Piles Weight
    1,150t
  • Soil Condition
    Sand with cobbles
  • Water depth
    45m
  • Project categories
    SIP-1
+