HomeTrack RecordGlobal Tech Transformer Substation

Global Tech Transformer Substation

The Global Tech Transformer Substation is the first suction pile foundation in the German sector approved by BSH.

Scope of Work

  • Preparation and review of platform T&I procedures
  • Geotechnical design suction piles
  • Installation engineering for installation of suction piles
  • Provision of construction crew on vessel
  • Installation of suction piles

Facts and figures

  • Client
    Keppel Verolme
  • Year Completed
    2013
  • Location
    North Sea German Bight
  • Suction piles
    4x 11m OD x 9.5m length
  • Topsides Weight
    4,850t
  • Jacket and Suction Piles Weight
    3,900t
  • Soil Condition
    Dense Sands
  • Water depth
    40m
  • Project categories
    Jackets
+