HomeTrack RecordGFI Bualuang Field Development FPSO mooring

GFI Bualuang Field Development FPSO mooring

SPT Offshore Suction Pile Cluster (SPC) was the most convenient and cost efficient solution for the mooring of the Bualang FPSO.

Scope of Work

  • Design of cluster suction pile foundation
  • Installation of suction pile cluster foundation

Facts and figures

  • Client
    EMAS
  • Year Completed
    2007-2008
  • Location
    Gulf of Thailand
  • Suction Piles
    1x cluster with 3x 4.2m OD x 4.5m length with a 300t connection
  • Soil Condition
    Soft to stiff clays
  • Water Depth
    30m
  • Project categories
    Moorings
+