HomeTrack RecordGaz de France Q13-A Platform

Gaz de France Q13-A Platform

For GDF, SHL and SPT Offshore installed the Q-13A jacket within 24 hours over an existing well. The total platform installation was achieved in only 3 days, lowering cost by reducing the offshore installation duration.

Scope of Work

  • Detailed desing of suction piles including capacity and installation engineering
  • Installation of the suction pile foundation

Facts and figures

  • Client
    Seaway Heavy Lift
  • Year completed
    2013
  • Location
    North Sea, Dutch Sector
  • Suction Piles
    4x suction pile of 7m OD x 7.4m length
  • Topside Weight
    1,700t
  • Jacket and Suction Piles Weight
    1,300t
  • Soil condition
    Dense sands
  • Water depth
    20m
  • Project categories
    Jackets
+