HomeTrack RecordCLP Met Mast

CLP Met Mast

For the Hong Kong offshore wind farm, CLP decided to deploy a SIP-1 platform for the Met Mast.

Scope of Work

  • Detailed design suction pile foundation
  • Installation of SIP1 suction pile foundation

Facts and figures

  • Client
    COOEC
  • Year Completed
    2012
  • Location
    Hong Kong
  • Topsides Weight
    50 mT
  • Water Depth
    30m
  • Project categories
    SIP-1
+