Chevron Frade Field Subsea Development

Due to SPT Offshore's SAPS-003 with intergated lift and handling frame, an average complete suction pile installation of only 7 hours per pile was met at a water depth of 1,100m. A full survey and positioning system was integrated in the SAPS-003 pump, saving fabrication costs and offshore handling time.

Scope of work

  • Detailed design of suction piles for the mooring of subsea risers
  • Fabrication of suction piles in Brazil
  • Installation of suction piles using ultra deepwater sution pump SAPS-003

Facts and figures

  • Client
    Subsea7
  • Year Completed
    2007-2008
  • Location
    Brazil
  • Suction Piles
    22x 3m OD x 6m tot 9m length
  • Soil Condition
    Soft clays
  • Water depth
    1.100m
  • Project categories
    Pipelay Startup
+