Centrica F3-FA

Centrica has chosen the SIP-2 concept for an expected short field life of 7 years, after which the platform will be relocated to another offshore site. SPT Offshore managed to meet a 18 months EPCI schedule and the offshore installation took only 52 hours with a minimum offshore spread consisting of a cargo barge, towing tugs and an OCV. 

Scope of Work

  • Detailed design suction piles
  • Fabrication suction piles
  • Detailed design grillage and seafastening
  • Fabrication of seafastening and deck cantilever beams
  • Marine design and model testing at MARIN test basin
  • Transport from Flushing to F3FA site and offshore installation SIP-2

Facts and figures

  • Client
    Heerema Fabrication Group
  • Year Completed
    2010
  • Location
    Dutch sector North Sea F3-FA field
  • Suction Piles
    4x 15m OD x 13m length
  • Topsides Weight
    4,500t
  • Substructure and Suction Piles Weight
    5,500t
  • Soil Conditions
    Dense to very dense sand
  • Water Depth
    40m
  • Project categories
    SIP-2

BBC Broadcast 25 October 2010

Start de video
+