Burlington Resources Rivers Field Development Calder

For Burglinton Resources, a critical EPCI schedule of 9 months was met for a SIP-2. SPT Offshore succesfully installed the suction pile foundation in gravel layered soil 

Scope of Work

  • Transport from Teesside to Irish Sea and offshore installation of complete SIP2 platform
  • Design of suction pile foundation
  • Fabrication of 4 suction piles
  • Marine design and preparation of transport and installation procedures

Facts and figures

  • Client
    Genesis Oil & Gas Consultants
  • Year Completed
    2002
  • Location
    East Irish Sea, UKCS
  • Suction Piles
    4x 9m OD x 5.75m length
  • Topsides Weight
    700t
  • Substructure and Suction Piles Weight
    1.200t
  • Soil Condition
    Loose to very dense sands
  • Water depth
    30m + 9m tide
  • Project categories
    SIP-2
+