HomeTrack RecordBurlington Resources Millom West

Burlington Resources Millom West

Scope of Work

  • Concept design
  • Detailed design suction piles
  • Installation suction pile foundation

How Suction Piles Saved the Millom West Project

By a last minute change to replace the concrete base by suction piles, the Millom West platform foundation overcame critical foundation issues. Read the full article on www.offshore-mag.com

Facts and figures

  • Client
    Burlington Resources
  • Suction Piles
    4x 7m OD x 9m deep
  • Topsides Weight
    750t
  • Soil Condition
    Loose to dense sands with thin clay layers
  • Water Depth
    29m + 9m tide
  • Project Categories
    SIP-2
  • Project categories
    SIP-2
+