HomeTrack RecordAthena FPSO

Athena FPSO

SPT Offshore succesfully installed 9 suction pile anchors for the mooring lines of the Athena FPSO

Scope of Work

  • Suction pile installation engineering
  • Suction pile installation services 

Facts and figures

  • Client
    Bibby Offshore
  • Year Completed
    2011
  • Location
    UK Central North Sea
  • Suction Piles
    5x 5m OD x 13.5m length
    3x 6.5m OD x 11m length
    1x 5m OD x 11m length
  • Soil Condition
    Sandy and clayey soils
  • Water depth
    140m
  • Project categories
    Moorings
+