Recent

World’s fastest installation of suction bucket jacket foundation

While world’s fastest installation of suction bucket jacket foundation could mark fourth offshore wind industry first...

Final turbine successfully installed for EOWDC

The eleventh and final MHI Vestas turbine was erected on 26 May at the European Offshore Wind Deployment Centre (EOWDC) where...

Giant Turbine Rises in Aberdeen Bay (Timelapse)

Vattenfall is currently installing eleven MHI Vestas wind turbines on the European Offshore Wind Deployment Centre...

FNLG facility at Moheshkhali

At the start of 2018, SPT Offshore was contracted by Jumbo’s Offshore Division to assist with the installation of 8...

Aberdeen Offshore Wind Farm

The floating crane Asian Hercules III has installed the first of eleven suction bucket jacket foundations on...

Conference “Substructures for UK Offshore Wind”

Join us at the 4th International conference “Substructures for UK Offshore Wind”, from 27 February – 1 March...

Decommission Dogger Bank Met Masts

At the end of September,  Seafox and Ardent teamed up with SPT Offshore d ecommissioned two Forewind’s Dogger...

Dudgeon Offshore Wind Farm opens

Statkraft and its partners Statoil and Masdar officially opened the 402MW Dudgeon Offshore Wind Farm built off the...

‘First Oil’ at the Ophir field

Octanex has achieved first oil from its Ophir field, offshore Malaysia.

+