HomeWhy usNewsImmpression of the completion of the Ophir Wellhead platform installation

Immpression of the completion of the Ophir Wellhead platform installation

Recent

SPT Offshore is proud to show you the film made of the completion of the Ophir Wellhead platform installation.

Scope of work

The jacket with integrated suction pile foundation is installed in one piece offshore, which made a safe and swift offshore execution possible. The 350mT topsides on a tri-legged jacket with a suction pile foundation is fabricated at Muhibbah's fabrication yard in port Klang. wo transport barges transported the 3-legged suction pile Jacket, boatlanding and topside to the Ophir installation site 200km offshore of Malaysia.

 

After start of the installation of the jacket on the early morning of the 9th of April, the boatlanding was lifted on the next day. Subsequently, the topside was immediately lifted and placed on the jacket within a few hours on the 11th, completing this 3 lift offshore operation within a record breaking 72 hours. 

SPT achievements

• Basic and detailed design suction pile foundation

• Basic design of jacket • T&I engineering

• Transportation of jacket and topsides from Port Klang to PM-315 site

• Offshore installation of jacket and topsides SPT achievements

• Complete offshore installation within only 3 days

• Jacket installation within 24 hours

• Jacket verticality within 0.2 degrees

• Successful project execution within schedule and budget 

Client

Muhibbah Engineering (M) Bhd. Block PM-315, Malaysia

+